Well I finished carpeting all the decks today. The floor was done before work with the edges getting done progressivly throughout the day. I found that if i folded the edges over and left them there with some weight for a period that the carpet would take on some memory and make glueing a little easier. So whilst making things easier, it also slowed them down a tad as I was glueing a side, leaving it for an hour or so, then folding the next edge, leaving for an hour or so then coming back and glueing. I think u get the picture.
The other set back I found today, was that the transducer bracket I had welded was not long enough to accomodate both of the transducers, I hadnt allowed for the fact that the dual frequency transducer would be so big. My plan now is to use liquid nails on the speed temp sensor as a temporary measure until I get back from my trip. Then I'll look at having another bracket welded onto the other side to accomodate that transducer.
With the floor now completed I put that in but have not yet fastened it down. I'm not sure If I will either at this point as it is easier to remove this way after a day on the water and it doesnt move anywhere so ........
__________________
PB Bream - Bait 42cm
PB Bream - SP 52cm
PB Bream - HB 44cm
Its a work in progress
Last edited by CK; 24-04-2008 at 11:27 PM.
|